Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13696422
- Product Categories
- Friendly Links
- home > Supply > Shaftless screw conveyor installation: a stainless steel U-shaped trough bracket bolted connections are tight and infrastructure; 2 U ultra-high molecular liner wear, block by block placed in the bottom of the trough, and tighten the pressure of the liner
Shaftless screw conveyor installation: a stainless steel U-shaped trough bracket bolted connections are tight and infrastructure; 2 U ultra-high molecular liner wear, block by block placed in the bottom of the trough, and tighten the pressure of the liner
Information Name: | Shaftless screw conveyor installation: a stainless steel U-shaped trough bracket bolted connections are tight and infrastructure; 2 U ultra-high molecular liner wear, block by block placed in the bottom of the trough, and tighten the pressure of the liner |
Published: | 2015-04-13 |
Validity: | 30 |
Specifications: | |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | Shaftless screw conveyor installation: a stainless steel U-shaped trough bracket fastening bolts and foundation; 2 U ultra-high molecular liner wear, block by block placed in the bottom of the trough, tighten liner layering; 2 The U-shaped ultra high molecular liner wear, block by block placed in the bottom of the trough, tighten liner layering; 3 Vertical installation form, the motor gear fixed to the chute end flange, convex surface should tie good; 4 spirochetes sleeve and electrical connections are tight cut conveyor shaft; 5 shaftless screw conveyor in place and adjusted to the desired angle, pad is fixed at the bottom of the bracket; 6 Check the top surface of the trough, bottom mounting levelness, ensure concentricity error trough level of degree and with spirochetes ≦ 5/1000; 7 and in strict accordance with explosion protection requirements, according to the electrical wiring diagram, connect the power cord and magnetic starter. Shaftless screw conveyor according to test a drive Machinery Co., Ltd. "manual" requirements to join the specified lubricant on top of the gear oil plug replacement for ventilation cap; 2 Check the oil level in the gearbox is normal, make sure the oil level Located in the middle of the mirror oil; put a little water or less than the diameter of the material within three spiral chute; 4:00 move shaftless screw conveyor, spiral observe the functioning of such rotation is incorrect, you should adjust the electrical wiring to ensure proper operation of the conveyor; If the screw conveyor to move the power switch is no action, check wiring, power and spirochete is stuck. Shaftless screw conveyor drive before operating a motor rotation direction should ascertain whether the job requirements. You should also check whether the debris inside the tank, especially in the middle of the blockage spirochete to avoid blockage. 2 Enter conveyor material, should conduct the necessary cleanup to prevent impurities or cake chunks into the conveyor, to ensure normal operation of the conveyor. 3 starters should ensure load starting, parking should be drained before parking stand material. 4 during operation, such as found in chunks of impurities into the trough, treatment should be immediately stopped. In the absence of non-stop direct hand or with other tools inserted into the trough dig materials. 5 always clear adhesive material throughout the machine, in order to avoid delivery decreased even clogging. 6 conveyor must reclosable cap to prevent external items into the trough, and even accidents. Botou City Jie Tai Machinery Factory staff will warmly welcome friends old and new customers to visit, to discuss cooperation, common development, create brilliant! |
Admin>>>
You are the 7009 visitor
Copyright © GuangDong ICP No. 10089450, Botou Environmental Protection Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7009 visitor
Copyright © GuangDong ICP No. 10089450, Botou Environmental Protection Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility